JOURNAL PUBLICATION
1. Construction Cost Comparison Between Conventional and Formwork System for Condominium Project
Journal type: Other Abstracting / Indexing Bodies
2. Quality function deployment modelling to enhance industrialised building system adoption in housing projects
Journal type: Citation-Indexed - Scopus
3. Building Cost Comparison Between Conventional and Formwork System: A Case Study of Four-Storey School Buildings in Malaysia
Journal type: Citation-Indexed - Scopus
4. Factors Influencing the Rise of House Price in Klang Valley
Journal type: Other Abstracting / Indexing Bodies
5. Overview on the house price in Klang Valley
Journal type: Other Abstracting / Indexing Bodies
6. A Literature Review Of The Advantages And Barriers To The Implementation Of Industrialised Building System (IBS) In Construction Industry
Journal type: Non Citation-Indexed
7. Building Cost Comparison Between Conventional and Fully Prefabricated System in Malaysia: A Case Study of Single & Double Storey House
Journal type: Non Citation-Indexed
8. A Survey on Construction Cost Comparison Between Conventional and Industrialised Building System for Housing Project
Journal type: Non Citation-Indexed
9. THE APPLICATION OF QUALITY FUNCTION DEPLOYMENT (QFD) IN THE DESIGN PHASE OF INDUSTRIALIZED BUILDING SYSTEM (IBS) APARTMENT CONSTRUCTION PROJECT
Journal type: Other Abstracting / Indexing Bodies
10. The effect of communication in identity in virtual project managements
Journal type: Non Citation-Indexed
11. A Critical Review on the Implementation of Building Information Modelling (BIM) in Malaysia
Journal type: Citation-Indexed - Scopus
12. Building Cost Comparison Between Conventional And Formwork System
Journal type: Non Citation-Indexed
13. Building Cost Comparison between Conventional and Formwork System
Journal type: Non Citation-Indexed
14. Construction Cost Variance for School Project in Malaysia
Journal type: Other Abstracting / Indexing Bodies
15. Implementation of Building Information Modelling (BIM) in Malaysia: A Review
Journal type: Citation-Indexed - Scopus
16. Existing Practices of Building Information Modeling (BIM) Implementation in the Public Sector
Journal type: Citation-Indexed - Scopus
17. Literature review of the benefits and obstacle of horizontal directional drilling
Journal type: Citation-Indexed Journal - ERA
18. Strategies to Improve Cost and Time Control Using Building Information Model (BIM); Conceptual Paper
Journal type: Citation-Indexed - Scopus
19. Improving Cost and Time Control in Construction Using Building Information Model (BIM): A Review
Journal type: Citation-Indexed - Scopus
20. Development of a mobile aquaculture management systems for performance monitoring of aquaculture players
Journal type: Citation-Indexed - Scopus
21. Developing Advanced Appliances Control System in Toilet and Bathroom for Aged Generation: FGD Preliminary Findings
Journal type: Other Abstracting / Indexing Bodies
22. THE POTENTIAL USE OF BIM THROUGH AN ELECTRONIC SUBMISSION: A PRELIMINARY STUDY
Journal type: Citation-Indexed - Scopus
23. Strategies to Improve Communication Management within Virtual Project Teams
Journal type: Citation-Indexed - Scopus
24. Development of Internet of Thing (IoT) Technology for flood Prediction and Early Warning System (EWS)
Journal type: Citation-Indexed - Scopus
25. Investigating Approaches of Integrating BIM, IoT, and Facility Management for Renovating Existing Buildings: A Review
Journal type: Citation-Indexed Journal - Science Citation Index (JCR)
26. Systematic Review on the Attributes of Resident Satisfaction Measurement in the Facility Management Context
Journal type: MYCITE
27. The Role of the Interface and Interface Management in the Optimization of BIM Multi-Model Applications: A Review
Journal type: Citation-Indexed Journal - Social Science Citation Index (JCR)
28. THE INTRODUCTION OF FRAMEWORK IN ALTERNATIVE DISPUTE RESOLUTION (ADR) TO ENHANCE THE METHOD USAGE WITHIN CONSTRUCTION INDUSTRY IN MALAYSIA
Journal type: Non Citation-Indexed
29. Critical Success Factors for Building Information Modelling (BIM) Implementation for Power Plant Projects in Malaysia
Journal type: Citation-Indexed - Scopus
30. Leadership in Construction: A Scientometric Review
Journal type: Citation-Indexed Journal - Science Citation Index (JCR)
31. Energy Consumption of Retrofitting Existing Public Buildings in Malaysia under BIM Approach: Pilot Study
Journal type: Citation-Indexed Journal - Social Science Citation Index (JCR)
32. Knowledge Map of Climate Change and Transportation: A Bibliometric Analysis Based on CiteSpace
Journal type: Citation-Indexed Journal - Science Citation Index (JCR)
33. EXPLORING QUALITY DIMENSIONS FROM A CONSTRUCTION PERSPECTIVE: A LITERATURE REVIEW
Journal type: Citation-Indexed - Scopus
34. Automotive Technology and Patent Assignee in Malaysia: An Exploratory Patent
Journal type: Citation-Indexed - Scopus
35. The applications of the risk management & quality function deployment in the Malaysian Construction Industry: A critical perspective
Journal type: Citation-Indexed - Scopus
36. THE IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEMS (IMS) IN CONSTRUCTION ORGANIZATIONS IN MALAYSIA
Journal type: MYCITE
37. Developing a new model to control risk and improve quality in the construction industry by integrating risk management and quality function deployment
Journal type: Citation-Indexed - Scopus
38. Status, Challenges and Future Directions in the Evaluation of Net-Zero Energy Building Retrofits: A Bibliometrics-Based Systematic Review
Journal type: Citation-Indexed Journal - Science Citation Index (JCR)
39. A Critical Review by Using SWOT Analysis to Identifying Risk in the Malaysian Construction Industry: Case Study Evaluation
Journal type: Non Citation-Indexed
40. Developing a risk framework for assembly construction based on stakeholder theory and structural equation modelling
Journal type: Citation-Indexed Journal - Science Citation Index (JCR)
41. Relative improvements between roads and railways and transport carbon dioxide emissions: An environmental Kuznets curve hypothesis test in China
Journal type: Citation-Indexed - Scopus
42. Customer perceived value theory and PSO-LightGBM algorithm-based approach to evaluating satisfaction factors with Net-zero energy building retrofits
Journal type: Citation-Indexed - Scopus
PUBLICATION
2024
Developing a new model to control risk and improve quality in the construction industry by integrating risk management and quality function deployment
2024
Status, Challenges and Future Directions in the Evaluation of Net-Zero Energy Building Retrofits: A Bibliometrics-Based Systematic Review
2024
Developing a risk framework for assembly construction based on stakeholder theory and structural equation modelling
2023
EXPLORING QUALITY DIMENSIONS FROM A CONSTRUCTION PERSPECTIVE: A LITERATURE REVIEW
2023
Knowledge Map of Climate Change and Transportation: A Bibliometric Analysis Based on CiteSpace
2023
Automotive Technology and Patent Assignee in Malaysia: An Exploratory Patent
2023
Energy Consumption of Retrofitting Existing Public Buildings in Malaysia under BIM Approach: Pilot Study
2022
The applications of the risk management & quality function deployment in the Malaysian Construction Industry: A critical perspective
2022
Leadership in Construction: A Scientometric Review
2022
Study of Management of Construction Waste Material in Residential Projects: A Review
2022
Critical Success Factors for Building Information Modelling (BIM) Implementation for Power Plant Projects in Malaysia
2021
Investigating Approaches of Integrating BIM, IoT, and Facility Management for Renovating Existing Buildings: A Review
2021
The Role of the Interface and Interface Management in the Optimization of BIM Multi-Model Applications: A Review
2021
A new Approach for Integrating BIM, IoT and Facility Management in Renovating Existing Buildings
2021
CRITICAL SUCCESS FACTORS FOR BIM IMPLEMENTATION FOR POWER PLANT PROJECTS IN MALAYSIA
2020
Project Risk Management Through Alternative Dispute Resolution (ADR) Promotes Feasible Means of Settling Construction Disputes Than via Traditional Litigation
2019
Development of Internet of Thing (IoT) Technology for flood Prediction and Early Warning System (EWS)
2019
Strategies to Improve Communication Management within Virtual Project Teams
2019
Strategies to Improve Communication Management within Virtual Project Teams
2019
Developing Advanced Appliances Control System in Toilet and Bathroom for Aged Generation: FGD Preliminary Findings
2018
THE POTENTIAL USE OF BIM THROUGH AN ELECTRONIC SUBMISSION: A PRELIMINARY STUDY
2018
Improving Cost and Time Control in Construction Using Building Information Model (BIM): A Review
2018
Development of a mobile aquaculture management systems for performance monitoring of aquaculture players
2017
Improving Cost and Time Control in Construction Using Building Information Model (BIM): A Review”
2017
Implementation of Building Information Modelling (BIM) in Malaysia: A Review
2017
A Critical Review on the Implementation of Building Information Modelling (BIM) in Malaysia
2016
Existing Practices of Building Information Modeling (BIM) Implementation in the Public Sector
2015
Overview on the house price in Klang Valley
2015
Quality function deployment modelling to enhance industrialised building system adoption in housing projects
2013
Construction Cost Comparison Between Conventional and Formwork System for Condominium Project
2013
Factors Influencing the Rise of House Price in Klang Valley
2013
Construction Cost Comparison Between Conventional and Formwork System for Condominium Project
2012
Construction Cost Variance for School Project in Malaysia
2012
THE APPLICATION OF QUALITY FUNCTION DEPLOYMENT (QFD) IN THE DESIGN PHASE OF INDUSTRIALIZED BUILDING SYSTEM (IBS) APARTMENT CONSTRUCTION PROJECT
2005
Building Cost Comparison Between Conventional and Formwork System: A Case Study of Four-Storey School Buildings in Malaysia